- Complete planning documentation for 5-phase development - UI design specifications and integration - Domain architecture and directory templates - Technical specifications and requirements - Knowledge incorporation strategies - Dana language reference and integration notes
154 lines
4.7 KiB
Markdown
154 lines
4.7 KiB
Markdown
# Phase 4: Integration and Optimization
|
|
|
|
**Timeline**: Weeks 17-20
|
|
**Objective**: Optimize performance, add integrations, and prepare for production
|
|
**Success Criteria**: Production-ready system with integrations and optimized performance
|
|
|
|
## Overview
|
|
|
|
Phase 4 focuses on system integration, performance optimization, and production readiness. This phase ensures the system can handle real-world usage and integrates with external tools and services.
|
|
|
|
## Critical Dependencies
|
|
|
|
- **Requires Phase 3**: All core features functional
|
|
- **Performance Baseline**: Established metrics from previous phases
|
|
- **Integration APIs**: Access to target external services
|
|
- **Production Environment**: Infrastructure for deployment
|
|
|
|
## Detailed Implementation Plan
|
|
|
|
### Week 17: Performance Optimization
|
|
|
|
#### Backend Optimization
|
|
- [ ] Database query optimization and indexing
|
|
- [ ] API response time optimization
|
|
- [ ] Memory usage optimization
|
|
- [ ] Caching strategy implementation
|
|
- [ ] Background job processing optimization
|
|
|
|
#### Frontend Optimization
|
|
- [ ] Bundle size optimization
|
|
- [ ] Image and asset optimization
|
|
- [ ] Rendering performance improvements
|
|
- [ ] Network request optimization
|
|
- [ ] Progressive loading implementation
|
|
|
|
### Week 18: External Integrations
|
|
|
|
#### API Integrations
|
|
- [ ] Notion integration for content sync
|
|
- [ ] Obsidian integration for markdown sync
|
|
- [ ] GitHub integration for code repositories
|
|
- [ ] Calendar integration for timeline features
|
|
- [ ] Email integration for content ingestion
|
|
|
|
#### Service Integrations
|
|
- [ ] Cloud storage providers (Dropbox, Google Drive)
|
|
- [ ] Productivity tools (Todoist, Trello)
|
|
- [ ] Communication platforms (Slack, Discord)
|
|
- [ ] Browser extensions for web content
|
|
- [ ] Mobile app companion
|
|
|
|
### Week 19: Advanced Features
|
|
|
|
#### Collaboration Features
|
|
- [ ] Multi-user knowledge sharing
|
|
- [ ] Real-time collaboration
|
|
- [ ] Version control for knowledge graphs
|
|
- [ ] Comment and annotation system
|
|
- [ ] Access control and permissions
|
|
|
|
#### Analytics and Insights
|
|
- [ ] Usage analytics and reporting
|
|
- [ ] Knowledge growth metrics
|
|
- [ ] Content quality analytics
|
|
- [ ] Performance monitoring dashboard
|
|
- [ ] User behavior insights
|
|
|
|
### Week 20: Production Readiness
|
|
|
|
#### Security and Compliance
|
|
- [ ] Security audit and penetration testing
|
|
- [ ] Data encryption implementation
|
|
- [ ] Privacy compliance (GDPR, CCPA)
|
|
- [ ] Access logging and monitoring
|
|
- [ ] Backup and disaster recovery
|
|
|
|
#### Deployment and Operations
|
|
- [ ] Production deployment pipeline
|
|
- [ ] Monitoring and alerting setup
|
|
- [ ] Automated backup systems
|
|
- [ ] Performance monitoring
|
|
- [ ] Incident response procedures
|
|
|
|
## Deliverables
|
|
|
|
### Performance Improvements
|
|
- [ ] 50% improvement in response times
|
|
- [ ] 60% reduction in bundle size
|
|
- [ ] Support for 10x current user load
|
|
- [ ] <100ms API response times
|
|
- [ ] <2 second page load times
|
|
|
|
### Integrations
|
|
- [ ] 5+ external service integrations
|
|
- [ ] API documentation for integrations
|
|
- [ ] Integration testing suite
|
|
- [ ] User onboarding for integrations
|
|
|
|
### Production Features
|
|
- [ ] Multi-user collaboration
|
|
- [ ] Advanced analytics dashboard
|
|
- [ ] Security and compliance features
|
|
- [ ] Production deployment scripts
|
|
|
|
## Success Metrics
|
|
|
|
- [ ] Performance benchmarks met or exceeded
|
|
- [ ] All integration APIs functional
|
|
- [ ] Security audit passed
|
|
- [ ] Production deployment successful
|
|
- [ ] User load testing passed
|
|
|
|
## Risk Mitigation
|
|
|
|
### Technical Risks
|
|
- **Integration Complexity**: Start with core integrations first
|
|
- **Performance Regression**: Continuous performance monitoring
|
|
- **Security Vulnerabilities**: Regular security reviews
|
|
- **Scalability Issues**: Load testing throughout development
|
|
|
|
### Timeline Risks
|
|
- **Integration Dependencies**: Parallel development with vendors
|
|
- **Testing Complexity**: Automated testing for all integrations
|
|
- **Deployment Challenges**: Staging environment for testing
|
|
|
|
## Testing Strategy
|
|
|
|
### Performance Testing
|
|
- [ ] Load testing with realistic user scenarios
|
|
- [ ] Stress testing for peak loads
|
|
- [ ] Memory and resource usage testing
|
|
- [ ] Network condition simulation
|
|
|
|
### Integration Testing
|
|
- [ ] API contract testing for all integrations
|
|
- [ ] End-to-end integration workflows
|
|
- [ ] Error handling and recovery testing
|
|
- [ ] Compatibility testing across platforms
|
|
|
|
### Security Testing
|
|
- [ ] Penetration testing
|
|
- [ ] Vulnerability scanning
|
|
- [ ] Access control testing
|
|
- [ ] Data privacy compliance testing
|
|
|
|
## Phase Gate Criteria
|
|
|
|
Phase 4 is complete when:
|
|
- [ ] Performance optimizations implemented
|
|
- [ ] Key integrations functional
|
|
- [ ] Security requirements met
|
|
- [ ] Production deployment ready
|
|
- [ ] All testing passed</content>
|
|
<parameter name="filePath">docs/plans/project-phases/phase-4-integration-optimization.md |